sideboard, cabinet

  • Dimension :  

    (W) 150cm x (D) 45cm x (H) 75cm
     
  • Materials :

    MDF , solid wood leg
     
  •  Production Lead Time :

    Upon confirmation of order, item(s) will be scheduled for delivery and will typically require a minimum of  3 to 4 weeks for

More Details...

RM1,290.00 RM1,770.00
  • Dimension :  

    (W) 120cm x (D) 45cm x (H) 155cm
     
  • Materials :

    MDF + Veneer Body, Metal Leg
     
  •  Production Lead Time :

    Upon confirmation of order, item(s) will be scheduled for delivery and will typically require a minimum of  3 to 4 weeks

More Details...

RM2,290.00 RM2,680.00
  • Dimension :  

    (W) 120cm x (D) 45cm x (H) 120cm
     
  • Materials :

    Solid Wood leg, MDF board with veneer body
     
  •  Production Lead Time :

    Upon confirmation of order, item(s) will be scheduled for delivery and will typically require a minimum of  3 to

More Details...

RM2,590.00 RM3,110.00
  • Dimension :  

    (W) 110cm x (D) 40cm x (H) 140cm
     
  • Materials :

    Acacia Solid Wood leg, MDF board with veneer body
     
  •  Production Lead Time :

    Upon confirmation of order, item(s) will be scheduled for delivery and will typically require a minimum of 

More Details...

RM3,290.00 RM3,670.00
  • Dimension :  

    (W) 160cm x (D) 45cm x (H) 80cm
     
  • Materials :

    Acacia Solid Wood leg, MDF board with veneer body
     
  •  Production Lead Time :

    Upon confirmation of order, item(s) will be scheduled for delivery and will typically require a minimum of 

More Details...

RM2,690.00 RM3,280.00
  • Dimension :  

    (W) 155cm x (D) 45cm x (H) 80cm
     
  • Materials :

    Acacia Solid Wood body and leg, black back MDF panel
     
  •  Production Lead Time :

    Upon confirmation of order, item(s) will be scheduled for delivery and will typically require a minimum of 

More Details...

RM1,490.00 RM3,410.00
  • Dimension :  

    (W) 155cm x (D) 45cm x (H) 80cm
     
  • Materials :

    Acacia Solid Wood + veneer, metal leg
     
  •  Production Lead Time :

    Upon confirmation of order, item(s) will be scheduled for delivery and will typically require a minimum of  3 to

More Details...

RM1,590.00 RM3,720.00